Ivory Aquino Biography, Wiki, Net worth, Ethnicity, Parents, Husband, Height, Age, Movies & More
Olivia Shea
Published Apr 09, 2026
Ivory Aquino (born in March 1979, age: 42 years) is an American transgender actress born in the Philippines. She is best known for her transgender personality and has raised so much help to the transgender community throughout the world with her work.
She has been working as an actress for more than a decade but the role that earlier provided her new identity as the star was for her TV show When We Rise in which she portrayed the real-life character of transgender activist Cecilia Chung in 2017.
And now the new role in the movie that will raise her career heights and also her fan following over the social media is for the upcoming movie of HBO Max “Batgirl”. Yes, she has been assigned for the HBO DC comic Batgirl movie to portray the character of Alysia Yeoh.
As this news has broken in the media many people from the LGBTQ community across the world are keen to know about this American actress. So if you too are one out of many who follows Ivory on her Instagram and want to know more about her then keep reading the interesting article till the end.
Ivory Aquino’s Biography (Early Life, College & Education)
Ivory Aquino Wiki – The transgender actress and entertainer Ivory originally hails from the land of the Philippines. She belongs to the Filipino ethnicity and family. When she was young she become aware of her transgender facts. She share about her childhood that after her birth she never feel like a boy and always believed in herself as a girl. She shared that she was just assigned differently at birth.
When she reached her teens she started her hormone therapy to overcome her transgender facts but all didn’t work for Ivory and she decided to move to the USA from the Philippines. Living in the USA she completed her studies over there. She went to Boston to study music and attended Berklee College of Music where she graduated from summa cum laude.
She entered the music and singing world with a belief that there are no acting opportunities for Filipino transgender across the globe. But later in 2005 when she underwent her surgery to convert herself completely into a girl in Thailand changed her life so much. After it, she decided to work as an actor and to pursue her childhood dream of becoming an actor.
Ivory Aquino Wiki / Bio
| Full Real Name | Ivory Aquino |
| Nickname | Ivory |
| Popular for | Being a Transgender actress |
| Age (as of 2022) | 42 years old. |
| Profession | Acting |
| Date of Birth | In 1979 |
| Place of Birth | Philippine |
| Current Residence | New York City |
| Education | Graduated in Music |
| School Name | Private High School |
| College | Berklee College of Music |
| Net worth | $1 million USD |
| Nationality | American |
| Ethnicity | Asian |
| Religion | Buddhism |
| Zodiac Sign | Pisces |
| Language | English, Filipino |
Ivory Aquino Family (Nationality & Ethnicity)
Ivory Aquino Biodata:- She has once appeared in a personal interview though there she has not shared about her parents working she stated that her father and mother have remained so much supportive from her day of childhood when she was much time bullied by the student of the school.
She shared that after her gender confirmation surgery she woke upholding her mother’s hands and thought. Her father was also standing close to her after he awake after surgery.
In her interview Ivory also cleared that she is the niece of Filipino politician and former president Corazon Aquino.
Other than this she also has a sister named Danica Tubo Aquino, Camille Aquino, Baby Amurao Aquino but still, it is to be confirmed that Danica Tubo is her biological sister or not. Her entire family visited her in America in 2020 to wish her a Happy New Year.
Ivory Aquino’s Father, Mother, Sister & Brother
| Ethnicity | Asian |
| Religion | Buddhism |
| Nationality | American |
| Father | Mr. Aquino |
| Mother | Mrs. Aquino |
| Sister | 1. Danica Tubo Aquino (Not Confirmed) 2. Camille Aquino 3. Baby Amurao Aquino |
| Brother | Not Known |
| Husband | None |
Ivory Aquino Age, Birthday & Zodiac Sign
| Birthday | In March 1979 |
| Zodiac Sign | Pisces |
| Age | 42 years |
Ivory Aquino Height, Weight & Physical Appearance
| Height (approx.) | In Feet Inches: 5′ 2″ In Meters: 1.58 m In Centimetres: 158 cm |
| Weight (approx.) | In Kilograms: 50 kg In Pounds: 110 lbs. |
| Hair Color | Black |
| Hair Length | Long |
| Eye Color | Black |
| Distinctive Features | Bold eyes |
| Tattoos | No |
| Body Measurements | Breast-34 Waist-26, Hips-34 |
| Plastic Surgery | No. |
| Shoe Size | 6 US (5 UK). |
| Piercing | Yes In ears |
Ivory Aquino’s Movies, TV Shows & Career
Just after undergoing the Ivory feel that now she can act. She decided she will never undergo the life with stress that every transgender community people face and will become a good actor.
At the age of 26, she decided to change her life and to do something that may not have been done by any other transgender. She began her journey to become an actress and to motivate transgender kids that everything is possible for them to have a full and meaningful life.
She began her career by keeping the fact in private that she is transgender. In 2007 she got her first role to work as an actress in the short movie Virtue. After it, she executed the role of character Gomin in the other short video titled Alien Uprising. And in the same way, she keeps on working on short videos and started getting different contracts.
She made her TV debut in 2017 when she got the chance to portray the character of real-life transgender Cecilia Chung. This role of her changed the life of Ivory and overnight she becomes a renowned actress in the industry. This role provided her with a lot of respect and new offer in her career. Moving forward in her career she worked in different TV shows and movies.
And now in 2022 fans of Ivory will see her in the internationally realizing movie of DC comic Batgirl playing the historical role of Alysia Yeoh.
Ivory Aquino TV shows and Movies
| Title | Notes |
| Virtue: The Way of the Modern Samurai | Short Video |
| Alien Uprising | Video |
| Konstruksiyon | Short Video |
| Couch | Short Video |
| When We Rise | TV Series |
| When They See Us | TV Miniseries |
| Tales of the City | TV series |
| New Amsterdam | TV series |
| FBI: Most Wanted | TV series |
| Lapsis | Movie |
| Blue Bloods | TV series |
| Batgirl | Upcoming Movie |
Ivory Aquino Latest News
Since the DC’s Comics Batgirl movie shooting has started it has been breaking boundaries by its different facts.
And at the end of January, they added another fact by becoming the first live-action feature-length title in the DCEU (Diamond Comics’ Extended Universe) to feature an openly transgender character. The official of Batgirl has taken a successful step by casting Miss. Ivory Aquino for the role of Alysia Yeoh. Alysia Yeoh is said to be a transgender character that Ivory will showcase in the movie.
See Also– Alba Baptista Biography, Wiki, Net worth, Facts & News
The earlier character of Alysia was first introduced to DC Comics fans back in 2011 in the issue of Batgirl comic written by Gail Simone.
In the movie, fans of DC comics will find Alysia Yeoh as the best friend of Barbara Gordon a.k.a Batgirl played by actress Leslie Grace.
The news related to Aquino this role was earlier leaked in the mid of January after actress Leslie Grace posted a photo from the sets of the film tagging Aquino and captioning the show “Barbara and Alysia”.
Ivory Aquino Husband, Boyfriend Name & Relationships
It is difficult to bring out that Ivory being a transgender is following any close or love relationship with any male. She has been never captured with any male person by any media publishers. All that she shares is that she is currently living alone in the USA at home with one dog in her house. It is that fact she shifted to America alone and her parents are still spending their life in the Philippines. She has worked with different male actors but nothing has been heard about her relationship with any inside the gossip of media.
Ivory Aquino Children, Affairs & Personal Life
| Marital Status | Unmarried |
| Husband Name | None |
| Relationship Status | Single |
| Boyfriend Name | None |
| Kids | Son-None Daughter– None |
Ivory Aquino Net Worth, Income Source & Salary
Throughout her career Ivory has worked for a long in many TV series and executed great characters through her extraordinary acting skills. She has deposited a lot of dollars in her bank account that she has earned from her working as an actress.
She has shared lots of her pictures with many popular celebrities and experienced the luxury life of her that she got from her hard work. As she is in the industry for many years she must be having a Net worth equal to $ 1million USD that she has raised by working with many directors as an actress.
12 Facts You Need to Know About Ivory Aquino
- From the age of 5 Ivory came to know that she is transgender.
- She loves to wear miniskirts.
- Her dog’s name is Chewybear.
- Ivory loves to drink cold coffee.
- She met personally Cecilia Chung to get more knowledge related to her character in When We Rise.
- She considers Cecilia Chung now as her elder sister.
- Earlier she spoke for the Transgender right criticizing the Donald Trump administration for overturning federal protection of transgender students.
- She loves to go out with her dog.
- Miss. ivory loves to wear shades.
- She sometimes wears spectacles her eyesight is weak.
- Ivory is listed with Wikipedia for her great achievements.
- She is having 5000 followers on her Instagram account.
FAQ of Ivory Aquino
Who is Ivory Aquino?
She is a transgender actress from America.
How tall is Ivory Aquino?
Ivory seems to be 5 feet and 2 inches tall.
How old is Ivory Aquino
Ivory is almost 42 years old as of January 2022.
When was Ivory Aquino born?
She was born in 1979.
How much Net worth does Ivory Aquino have?
She must be having a net worth approximately of $1 million USD.
Which is the latest movie by Ivory Aquino?
She is going to act in Batgirl.